A clear adhesive backing and threaded post mounted through a white organizer’s bracket on tile Clear adhesive base Threaded post + cap nut
A no-drill mounting point

Illustrative installation. Organizer shown for context.

Clear adhesive screw mounting pads

Remount your rack. Skip the drill.

Give a compatible organizer a threaded mounting point on a suitable flat surface.

The clear base adheres to the surface. A metal post and cap nut fasten the rack through its existing mounting hole.

Choose your pack

Pack size

20 pads · $19.99

Pay with

Check your fixture’s mounting points and count how many pads you will need.

The rack is fine. The old mount gave out.

The organizer fits the space. Its mounting pad has loosened, or the replacement post barely reaches through the hole.

Before you replace the whole rack, check where the pad will sit and how much post needs to pass through the fixture.

A clear screw mounting pad beside the mounting holes of an empty wire organizer
Match the mount to your rack

There are two connections to get right.

Pad to surface. The whole backing needs a smooth, flat area. Check for grout lines, raised texture, and loose finishes.

Post to fixture. The post must pass through the hole with enough thread and room for the cap nut.

A transparent square mounting pad on the face of one smooth glazed tile, clear of the grout seam
Keep the whole base flat

A clear base. A threaded connection.

The clear backing sits against the surface. It keeps the mounting point discreet and needs enough smooth, flat space for the full pad.

The metal post goes through the fixture. Slide a compatible mounting hole over the post, then fasten it with the cap nut.

Check the post length, fixture thickness, and room to turn the nut before you apply the pad.

Clear square adhesive backing with a central metal threaded post and domed cap nut
Clear base. Metal screw connection.

Match the fix to the fixture.

Mounting optionWhat to check
Adhesive hookA loop or slot needs to sit securely on the hook shape.
Double-sided tapeThe fixture needs a broad, flat contact area.
Suction mountThe surface and the fixture both need to fit the suction base.
Wall anchorMatch the anchor to the wall and load. A drilled connection can be more appropriate for heavier items.
Adhesive screw padA suitable surface and enough room for the post and cap nut are both needed.

Measure the part that has to fit.

  • Pad footprint — The existing product drawing labels the base at approximately 2.35 × 2.3 in.
  • Post projection — The drawing marks approximately 0.4 in at the post. Usable thread depends on the assembled parts.
  • Fixture thickness — Check the depth at the hole and leave room for the cap nut to engage.
  • Clearance — Check the area around the hole and make sure the mounting base can sit flat.
Illustration of a mounting pad and bracket ready to be checked for fit
Check the mounting hole and post length

Keep the organizer you already own.

Check the rack and the pad on your counter first. A matching pad can give a compatible rack a new mounting point.

The empty white wire organizer on the counter with its two mounting holes and clear screw pads
Before · Check the fit
An example of an empty wire organizer fastened to clear adhesive screw pads on smooth tile
After · Refit the rack

Check the backing, post, and cap nut against your own fixture. Ask about tested conditions if your project depends on a specific load, wet location, or removal result.

A clear pad with its exposed threaded post and silver dome cap nut beside it
Check the post and cap nut
An empty organizer mounting hole lined up with the exposed post on a clear pad
Line up the mounting hole

Put a familiar rack back to work.

Picture the small organizer that already fits beside your sink. You know how many mounting points it needs and exactly where it belongs. A compatible replacement lets you keep that setup and put the space back to use.

Start with the two things you can see and measure today: the surface and the fixture.

Check, position, then mount.

Check your fixture’s measurements before peeling the backing.

  1. A hand wiping a smooth wall tile with a clean cloth before mounting
    1. Clean and dry

    Choose an approved, flat surface and follow the supplied cleaning and drying directions.

  2. A hand pressing a clear screw pad onto a flat tile with the metal post facing out
    2. Position the pad

    Align the pad with the fixture, then follow the supplied pressing and waiting directions.

  3. Fingers turning the cap nut onto the threaded post after it passes through the organizer’s mounting hole
    3. Fasten the fixture

    Once the required wait has passed, fasten the fixture and follow the stated load limit.

Check the terms before applying a pad.

Ask about return eligibility before you peel the liner if you’re uncertain about fit. Keep your order details and a photo of the fixture to hand if you need support.

Read Esmorab’s return policy for eligibility and conditions.

Count the mounting points for your next project.

Mark each position on your organizer and count the pieces you need. If you have more than one rack, check each one separately. The pack options show the total number of pads so you can choose the right quantity for your project.

Check current pack availability.

Choose a pack above to see the current price and availability. Count the mounting points on each fixture first.

Customer setups and feedback

We’re collecting photos that show how these pads fit different organizers and surfaces. If you’ve used this product, share your setup with Esmorab. Tell us what you mounted and what surface you used.

Share your setup

Questions to settle before you stick

Which surfaces should I use?
Confirm that the finish is approved for this pad. Choose a flat area large enough for the whole base and check for grout lines, texture, or loose finishes.
Can I use this on painted drywall or wallpaper?
Check with Esmorab before applying it to a painted or papered finish. Removing adhesive can lift a weak finish.
Will it fit my existing rack?
Compare the mounting hole, fixture thickness, post projection, and room for the cap nut. Check that the base can sit flat on the wall.
How much weight can I hang?
Ask Esmorab for a rating that applies to your surface, fixture, and conditions. For projects that require a specific load rating, use hardware rated for that job.
Can I mount it inside a shower?
Confirm direct water exposure and damp-area suitability for your setup before mounting it in the shower.
How long should I wait before loading it?
Follow the wait time in the instructions for your pack. Keep the fixture unloaded during that period.
Can I move the pad after it is applied?
Plan the position before peeling the liner. Check the instructions for removal and whether a replacement pad is needed.
How many are in each pack?
The listing offers 20, 40, 80, and 160 pads. Count the mounting points on the fixtures you plan to install.

Need help checking a fit?

Email service@esmorab.com with a photo of the intended surface and the fixture’s mounting hole. Include measurements of the opening and the thickness at the hole. Use the current store terms for order and return questions.

Contact Esmorab · Shipping · Returns